PlanSA components
PlanSA's ePlanning platform is made up of different online components:
- PlanSA portal website
- Development Application Processing (DAP) system
- Online Planning and Design Code
- South Australian Property and Planning Atlas (SAPPA)
- Council Financial Report Service
PlanSA is committed to ensuring its ePlanning system is responsive to the needs of its customers.
To view or to check on the status of a current enhancement project, visit the PlanSA system enhancements.
System updates are made fortnightly. After each update, system enhancements are documented as Release Notes and published on PlanSA.
Requests for system enhancements can be submitted to the PlanSA service desk via PlanSA@sa.gov.au.
DAP
Features | |
---|---|
Certificate of Occupancy (CoO) – updates to application view, building consent and apply for CoO | When a Certificate of Occupancy is required for a building/building works, then the Certificate of Occupancy tab and action to Apply for Certificate of Occupancy are available in the development application and Related Actions pages. If a Certificate of Occupancy (CoO) is not required, then these won’t be available. For building consents that include a building/building work with a Class 1a classification and are verified before 1 October 2024, the field "Is a Certificate of Occupancy required?" automatically defaults to No. This includes building consents currently under assessment. Within the application for a Certificate of Occupancy page the information box is updated and now reads: "A Certificate of Occupancy is not required for a Class 1a building where the application for building consent is lodged and verified before 1 October 2024." Latest version
|
Decision Notification (DNF) – updates to Building Occupation/Completion section | The Decision Notification Form (DNF) has been amended as per the Gazette notice on 7 December 2023. A note has been amended within the Building Occupation/Completion section related to Certificate of Occupancy requirements for Class 1a buildings to read: "A Certificate of Occupancy is not required for a Class 10 building or for a Class 1a building where the application for building consent is lodged and verified within the SA planning portal before 1 October 2024. In the meantime, a person must not occupy a Class 1a building for which a Certificate of Occupancy is not required unless it meets the minimum standards for occupancy under regulation 103H(2)." |
PowerBi
Features | |
---|---|
Power BI Report –Development Approval Statistics | A new Development Approval Statistics page within the Workload Management Report details dwelling and building statistics entered for Development Approvals. The report provides details such as development cost, number of created dwellings, building staging and variation to applications, providing a holistic overview of the application to assist with data reconciliation. |
Power BI Daily Till Report | The Daily Till Report now includes a subtotal column and a GST column. |
Power BI Report - Workload Management Enhancement | The workload analysis public notification underlying data has been enhanced to include the public notification reason and identify applications with multiple public notifications (for example commenced and subsequently cancelled). |
Referral Body Refund Report | The Referral Body Refunds report has been built for Referral bodies to access. |
DAP
Fixes | |
---|---|
Expired Request for Information (RFI) Requests | When a new assessor is assigned to a Consent with an expired RFI, this task is now reassigned and appears on the assessor's dashboard. |
ESP Report Updates | The ESP report no longer shows applications with the following statuses: Cancelled, Withdrawn, Refused. |
DALite
Feature | |
---|---|
Internal referral updates | An additional filter 'referral status' is now available in the Internal Referrals tab, enabling the ability to filter requests by distributed, responded or recalled. Other improvements include, showing the 'response date' and relocation of the 'applicant' to the more information (+) preview. |
PlanSA portal
Feature | |
---|---|
Development Application Register - Location map | The public development application register now includes a map of the application location and a link to the South Australian Property and Planning Atlas (SAPPA) within the property details. |
DAP
Features | |
---|---|
Crown and Essential Infrastructure Development Applications | Government agencies and prescribed entities can now submit new Crown and Essential Infrastructure applications within the Development Application Processing (DAP) system. Applications can be submitted from the DAP organisation account of organisations who have nominated that they are a “Crown Applicant”. Any referrals for Crown and Essential Infrastructure applications will be undertaken within the DAP and will appear in the 'For Your Action' dashboard for referral bodies. Please note: Applications that are currently under assessment will still be processed within the existing systems that they were originally lodged. Requests to vary previously approved Crown and Essential Infrastructure applications should be sent by email to spcapplications@sa.gov.au Latest version |
Submission of Crown and Essential Infrastructure Applications in the DAP | Organisation admin users are now able to edit their organisation account, to enable the submission of Crown or Essential Infrastructure applications. A new checkbox called "Crown Applicant" is available within the organisation page. Latest version |
Accepted and Exempt Assessment Pathways - Generate and Upload an Edited Document | When an application is assessed as an 'Accepted' or 'Exempt' development, the relevant authority can now generate a letter and modify the contents prior to issuing the decision. This letter will also be attached to the system generated email to notify the applicant and primary contact of the outcome. Latest version |
Fees - Urban Tree Canopy Offset and Urban Tree Fund Fees | Assessors can now issue a fee advice through the 'Related Actions' tab for Urban Tree Canopy Offset Fees and Urban Tree Fund Fee post consent decision and development approval. |
Mandatory Referral to Building Technical Panel - Private Bushfire Shelter | Following the verification of building consent for applications containing building works which include a Private Bushfire Shelter and are assigned a building classification of 10C, a mandatory referral to the Building Technical Panel will be distributed. |
PlanSA portal
Feature | |
---|---|
Register Organisation – Submit Crown Applications | When registering for a new organisation account for the Development Application Processing (DAP) system from the PlanSA website, users are now asked if their organisation needs to submit applications for Crown and Essential Infrastructure developments. Latest version |
DAP
Features | |
---|---|
Section 7 Data Extract – Building Indemnity Insurance | The data extract has been updated to include the following information relating to associated building indemnity insurance:
For previous applications, where these fields were not available for this information to be recorded in Development Application Processing (DAP) system, the data extract will populate "Council input required". Building indemnity insurance information can either be updated in the DAP or updated manually in the extract. |
Building Indemnity Insurance | The following additional fields related to building indemnity insurance have been included and are mandatory to be completed:
These fields are available and can be updated from the Building Consent (Assessment Information and Insurance tab), Development Approval and during notification stages. Updates to the insurance details will be recorded in the audit history of the application. Latest version |
Fixes | |
Land Division Inconsistency – Notify relevant authority, allocated assessor and primary contact | A Land Division Certificate marked inconsistent by State Planning Commission (SPC) Planning Services now sends an email "Consistency check required for land division certificate" to the allocated assessor for Land Division, relevant authority for planning consent and the primary contact. |
Land Division Certificate – Clearance Requirement Task | The "Satisfy Clearance Requirement" task created by State Planning Commission (SPC) Planning Services adding a clearance requirement to a Land Division Certificate will now be assigned to the assessor of the consent. When the allocated assessor for the consent is updated, the details of who allocated the "Satisfy Clearance Requirement" will reflect the updated information in the For Your Action dashboard. |
Rectification notification who submitting | Submission of a rectification notification now prompts to add a licensed building work contractor contact. |
Preview and record an inspection outcome | The Inspection Date and Time (regardless of the inspection category), Construction Commencement Date and Construction Completion Date (Adhoc inspections) now shows in the Inspection Details preview (read only) page. The notification date now shows when recording an inspection outcome. |
Submission – Public notification view signage requirements | The "View signage requirements" hyperlink now directs users to the Practice Direction 3 page on the PlanSA portal. |
Organisation and Users – Allowed 1800 or 1300 phone numbers | The contact number for an organisation and user(s) now accepts 1800 or 1300 phone numbers. Latest version |
Building Consent – Reset to verification | When fees are outstanding (i.e. payment required) a warning message now shows advising “Invoices pending payment must be cancelled before you can submit”; until resolved reset building consent is disabled. Submitting the reset to verification now creates a ”referral deleted” event record for initiated (i.e. not distributed) external referral(s). An external referral body (distributed referral) is copied into the “Reset building consent back to verification” email sent to the application’s primary contact. New Decision validation to check building/building works “Is certificate of Occupancy required” or “Is minor development” (class 1A), to prompt completion when empty following the building consent reset to verification. Latest version |
DALite
Fixes | |
---|---|
DALite Search Results – Assessment status | The “Assessment Status” section of an expanded search result in DALite has been updated, and the order of Consents and Development Approvals now matches the order in DAP. Where building consent stages are assessed simultaneously, these consent stages will now be grouped together. |
Relevant Authority Names | Minor amendments have been made to relevant authority names, to ensure the relevant authority name in DALite matches the name in DAP. For consents assessed by a council, the relevant authority name now specifies whether the consent is with the assessment manager or assessment panel. |
PlanSA portal
Feature | |
---|---|
Public development application register – filter by elements | The ‘Element’ filter available in the Advance Search and Edit your search page has been updated to either filter by 'all' elements or a specific elements (demolition, land division, telecommunications facility, tourist accommodation, or tree-damaging activity), not both. |
PlanSA portal
Feature | |
---|---|
Public Development Application Register | The following updates have been made to the public development application register, on the PlanSA portal:
|
PlanSA portal
Feature | |
---|---|
Landscape Board Referrals | The existing referral body 'Relevant authority under the Landscape South Australia Act 2019' has been replaced with the nine individual landscape boards across South Australia. Relevant authorities can now refer applications directly to the relevant landscape boards through the DAP. New referral bodies created:
Any referrals that are in-progress or have had responses provided, will be transferred across to the dashboard of the relevant landscape board. |
PowerBI
Fix | |
---|---|
Workload Management Report - Consent Pages - Active Assessment | The Consent page of the Workload Management Report has been updated to ensure the underlying data table lists all application rows, for the selection: “Active RFI (no response)”. |
PlanSA portal
Feature | |
---|---|
Development Application Map – Public Register | A new map viewer allows the public to view development applications lodged within a council area, on an interactive map. |
DAP
Features | |
---|---|
Apply for Extension to Operative Period - Applicants | An applicant can now initiate a request to extend the operative period of a consent or approval, through the Related Actions page of a development application. |
Fixes | |
Rectification Notification – ‘Not Inspected’ Outcome | When a rectification notification is completed with an outcome of “not inspected”, the "To be Inspected” field of the associated building work notification will no longer change. |
Rectification Notification – No Inspection | When the rectification notification “Inspection Required?” field is marked as 'No', a 'not inspected' inspection record is no longer created. |
Additional RFI - Referral Bodies | When an additional Request for Further Information (RFI) is initiated by a Referral Body, Applicant agreement is no longer prompted. Applicant agreement is still required and prompted when an additional RFI is initiated by a Relevant Authority. |
'For Your Action' Dashboard - Allocated Tasks | Where a task is allocated to a user, hovering over the “Who” column on the dashboard will now show the allocated user. |
Airport Referral – Fee Description | To assist with fee reconciliation, the Airport Referral Fee descriptions have been updated to include the name of the relevant Airport Referral Body. |
PlanSA portal
Feature | |
---|---|
Manage Subscriptions | Users can renew their subscriptions to the code amendment and development application register, even if their current subscription has not yet expired. |
Fixes | |
Development Application Register - Download CSV | When a search on the public Development Application Register has been filtered according to specific “elements”, the results in the downloadable CSV file will now have the same “element” filter applied. |
DAP
Features | |
---|---|
Tunnel Protection Code Amendment - Elements Update | Following the release of the Tunnels Protection Code Amendment, the following elements are now available for selection during submission and verification:
|
Assessment Reports - Planning and Design Code Version | The version of the Planning and Design Code in effect at the commencement of assessment of Planning/Land Division Consent, will now populate in both Assessment Reports. |
Building Notification - Additional Documents Notification | Whenever an additional document is uploaded to a building work where building notifications have already been submitted, an email notification will be sent to the Building Consent relevant authority and assessing officer. |
Event History - Downloaded Zip Files | A record is now added to the development application ‘Event History’, when a user downloads multiple documents in a ZIP file from the documents tab. |
User Reactivation - Relevant Authority Organisation | When an organisation administrator from a relevant authority organisation reactivates a user, a notification email is now sent directly to the PlanSA service desk to complete the reactivation process. |
Fixes | |
Decision Notification Form (DNF) - Issuing Authority | Where a Reserved Matter is assessed and determined to be 'met', the Decision Notification Form (DNF) will now accurately reflect that the updated DNF has been issued by the relevant authority for Planning Consent; instead of the authority who last issued a Consent. |
Decision Notification Form (DNF) - Statement of Compliance Additional Documentation | The following statement will now appear in Decision Notification Forms (DNFs) under each building work, regardless of whether the Building Certifier or Council (as relevant) requires any addition information to accompany the Statement of Compliance: |
Withdrawal of Certificate of Occupancy | When an applicant applies to withdraw a current application for a Certificate of Occupancy (CoO), the wording on the Related Actions page and associated information/ warning boxes has been updated. It is now clearer that the application for the CoO is being withdrawn, to avoid confusion with a request to withdraw the development authorisation. |
Land Division Certificate - Status | When land division certificates are issued and deposited, the Land Division Certificate status for applicants now shows as 'Certificate[s] finalised' instead of 'Certificate[s] in progress'. |
Summary Page - Map Viewer | If more than one land parcel is included in a development application, the Map Viewer on the application Summary page now shows all the selected land parcels. |
Building Inspection Notes - Character Limit Validation | When updating the Inspection Details page, the user now sees a warning message if they exceed the character limit in the 'Notes' field. The character limit and the current number of characters is also displayed. |
Refusing Consents - Stamped Plans not required | Relevant Authority users are no longer required to upload a copy of stamped plans, when refusing a Consent. The 'record decision' button is now available to the assessor, when the only outstanding action is to upload stamped plans in the documents tab. |
Record Building Notification Inspection | For council users, the Building Notifications option in the Assessments dashboard now refreshes immediately, to reflect 'yes' or 'no' to inspect a notification. |
Re-verification of a Consent and Generation of Code Rules at Assessment Start | When a planning consent is under assessment and the relevant authority edits the category of development, the consent must be verified again. In this situation, the 'Code Rules at Assessment' document will now be regenerated, based on the current version of the Planning and Design Code in effect at completion of verification. |
Edit Development Location - Remove Land Parcels | When a development location is edited by the relevant authority, land parcels can now be successfully removed. |
Accredited Professionals Portal
Feature | |
---|---|
Mutual Recognition and Equivalent Schemes Updates | New validations have been added in the Accredited Professional Portal, to:
|
PowerBI
Fix | |
---|---|
Workload Management Report – Links to DAP | Development applications (DAs) in the Workload Management Report which were missing a link to the DAP system have been updated, and now link successfully. |
DAP
Features | |
---|---|
Submission - Title or Plan Search for ‘Child’ Locations | When submitting an application, the ‘Title or Plan Search’ can now be used to find location(s) with the title or plan parcel references of a ‘child’ location. If the location reference (address) and/or location council are not yet available for a ‘child’ location, applicants will be prompted to enter the missing information into Update Locations fields, for ‘Location Reference’ and/or ‘Suburb’. Displayed location Zones & Overlays will show the zones & overlays of the ‘parent’ or ‘grandparent’ location, when none are found for the child location, and the SAPPA property location image will show ‘No Land Parcels Found’. |
Verification – ‘Child’ Locations | The Category of Development link(s) for the ‘Current P&D Code for this element’ will use the valuation number of the ‘parent’ or ‘grandparent’ location, when no codes rules are found for the ‘child’ location. The following existing behaviours are unchanged:
|
Generate Data Extract for Section 7 – Child title | Now able to search by a new allotment (child) ‘title’ or ‘plan parcel number’ to generate a Data Extract for Section 7. |
Essential Safety Provisions - Relevant Building or Building Part | On the Essential Safety Provisions (ESP) page, the maximum number of characters for the "Relevant building or building part" has increased from 1000 to 4000 characters. |
Fixes | |
Data Capture for Regulated/Significant Trees and Urban Tree Canopy | New questions and additional fields related to tree-damaging activities and the Urban Tree Canopy overlay were introduced to the DAP system, as part of Release 3.68.
|
Section 7 Data Extract -Duplicated "Development Description" Content | If there are multiple locations on an application, the "Development Details" section of the data extract will no longer populate with duplicated content. |
Snapshot Documents – Duplicated Zones and Overlays | If an application includes multiple locations where the same zone and overlays are applicable, the snapshot documents will not duplicate the Zones and Overlays information. |
DAP Report - Active Variations | The Active Variations Report now shows the allocated user for variations at Development Approval. |
Verification – Edit Development Location | An error message will no longer appear when users edit and delete all locations during verification. |
Water Entities - Amendments to Fee Description | The fee description 'Water Entities' has been amended to clarify that this fee is not required to be charged for referrals to SA Water as a water industry entity for the purpose of issuing land division consent. |
PlanSA portal
Features | |
---|---|
Manage Subscriptions | Modifications have been made to the layout of the manage subscription view. The new table format enables users to remove or renew multiple subscription(s) more easily. |
PlanSA portal
Features | |
---|---|
Development Application Register – Search Filters | Within the Development Application Public Register, users can now filter their search results by type of development, using the ‘element’ field. |
Development Application Register – Subscription Filter | When subscribing to be notified of lodged development applications, users can now select to be notified of applications containing the following development types (Elements):
|
Fixes | |
Current Notified Developments Map Viewer | Updates have been made to the Current Notified Developments Map Viewer summary, ensuring that the counts reflect the number of applications, not the number of land parcels. |
PowerBI
Features | |
---|---|
Building Inspections Report | The following updates have been made to the Building Inspections Report:
New report pages are available, including:
|
Council Area Report | The following updates have been made to the Council Area Report:
|
Workload Management Report | The following updates have been made to the Workload Management Report:
|
DAP
Features | |
---|---|
Fees and Charges 2023-24 Financial Year | New fees and charges take effect on 1 July 2023 as published on 18 May 2023 in the Government Gazette Notice. |
Miscellaneous Technical Enhancement Code Amendment - Update to Elements | There is a change to the development types available during submission and verification, following the release of the Miscellaneous Technical Enhancement Code Amendment.
The following options are now available for selection:
Relevant Authorities may be prompted to update selections, to reflect new element types. Please note, this does not affect planning consents that have already been verified and lodged. |
Adelaide Aquatic Centre Code Amendment - Update to Elements | There is a change to the development types available during submission and verification, following the release of the Adelaide Aquatic Centre Code Amendment. The following elements are now available for selection (if applicable for the location):
|
Urban Tree Canopy Offset Scheme | The existing Urban Tree Canopy Offset fee has been replaced by individual fees to reflect the required contributions into the Urban tree Canopy Offset Scheme by size (small, medium and large). |
Reset Building Consent to Verification | A new Reset Consent to Verification action is available within the Related Actions tab of the Building Consent. This allows the relevant authority to amend details only available during verification i.e. staging or reassigning the consent to another authority if it is already under assessment. Notification of the action will be sent to the applicant and recorded in the audit history. |
Airport Referral Fees | Assessors now have the ability to charge the Airport Referral fee through the DAP system when referring an application to an airport operator company. Please Note: Adelaide and Parafield Airport have elected to waive any referral fees associated with a mandatory referral to their agencies. |
Improved Data Capture for Regulated/Significant Trees and Urban Tree Canopy | A number of questions and fields related to tree-damaging activities and the Urban Tree Canopy Off Set Scheme have been updated within the submission, verification and assessment process, including:
|
Fixes | |
Land Division Certificate Page | Documents within the Land Division Certificate Page now appear in order of the date they were uploaded. |
Accredited Professional Portal
Features | |
---|---|
Application for Renewal - Receipt Attachment | When an Accredited Professional renews their accreditation and pays the associated fee, a copy of their receipt is now attached to the confirmation email. |
Reapplication for an Accreditation – Expiry within the last 12 months | This new application provides a streamlined process for an Accredited Professional to reapply for an accreditation that has expired within the last 12 months. |
DAP
Features | |
---|---|
Data Extract – Section 7 | Additional explanatory text has been added to the section of the data extract related to significant trees, clarifying that there are different types of regulated/ protected trees that may be present on the land. |
Public Notification Documents – Removal of Applicant Details | Practice Direction 3 – Notification of Performance Assessed Development Applications has been amended to remove the requirement to have the applicant's name on the notice to adjoining landowners/occupants. This letter and the sign on land template generated within the DAP has been amended to reflect this update. |
Fixes | |
Building Notification – Amendments to Date of Activity Example | Amendments have been made to the Date of Activity example within the Submit Building Notification page. The amendments also include the removal of text related to notification dates. |
DAP
Fixes | |
---|---|
Generation of Assessment Reports | The generation of assessment reports now directs users to a page confirming that the report generation is in progress. Once the document has been generated it will be available from within the document store. |
PlanSA portal
Feature | |
---|---|
Miscellaneous Technical Enhancement Updates for Development Approval Wizard and Online Planning and Design Code Enquiry Tool | The elements available to select within the Development Approval Wizard and the online Planning and Design Code have been updated. They now reflect definition changes which have been made as a result of the Miscellaneous Technical Code Amendment. The new selections available (if applicable for the location) are:
|
DAP
Feature | |
---|---|
Miscellaneous Technical Enhancement Code Amendment - Update to Elements | There is a change to the development types available during submission and verification, following the release of the Miscellaneous Technical Enhancement Code Amendment.
The following options are now available for selection:
Relevant Authorities may be prompted to update selections, to reflect new element types. Please note, this does not affect planning consents that have already been verified and lodged. |
DAP
Features | |
---|---|
PDI (General) Regulation Amendments - Request for Information (RFI) | The system has been updated to reflect amendments to Regulation 34(1), preventing an RFI from extending beyond one year. |
PDI (General) Regulation Amendments - Amended Applications | The relevant authority can now reset the assessment clock to include/exclude public notification and referral time, reflecting the amendments to Regulation 35(1). When the assessment clock is reset, an email is sent to the applicant, primary contact and referral bodies notifying the reason for the reset. |
PDI (General) Regulation Amendments - Airport Referrals | The prescribed time for referrals to airport operator companies has been increased from 20 to 30 business days. The additional referral timeframe is applied to all applications lodged following the release of the amended regulations. |
PDI (General) Regulation Amendments - Water Entities | A new internal referral and fee type for 'Water Entities' has been created and is now available for selection. This reflects amendments to Regulation 79(1), identifying all water industries licenced under the Water Industry Act 2012 as water industry entities for the purpose of issuing land division consent. |
Fixes | |
Land division Certificates on Applicant’s Your Applications Dashboard | An update has been made to ensure that when a Land Division Certificate is deposited, the application will remain in the "Finalised" section of the dashboard. Previously, deposited Land Division Certificates were appearing in the "Land division Certificate in progress" section. |
Accredited Professionals portal
Features | |
---|---|
Practical Experience Report – Available to Download | Accredited Professionals can now download their Practical Experience Report from the DAP system and export to excel, to add additional information and supplement with supporting documents. |
Reapplication for an Accreditation - Expired within the Last 12 Months | This new application option provides a streamlined process for an Accredited Professional to reapply for an accreditation that has expired within the last 12 months. |
Amend Accredited Professional Registration End Date at Renewal | The expiry date of accreditations under the Planning, Development and Infrastructure (Accredited Professionals) Regulations 2019 can be amended on renewal and brought forward, to align with accreditations issued by other professional associations, insurance or CPD training. |
Extension of Time to Lodge Renewal Application | Accredited Professionals can request an extension of time (of 3 months) to lodge their renewal application, in extenuating circumstances. Noting this does not change the anniversary date of the accreditation for future renewal applications. |
PlanSA portal
Fixes | |
---|---|
Removal of Qualifications and Experience details from Accredited Professionals register | Details regarding an accredited professional's qualifications and experience will no longer appear on the Accredited Professionals Register, in accordance with the regulation amendments. |
DALite
Features | |
---|---|
DALite Search - Regional Assessment Panel (RAP) | Users who are part of a Regional Assessment Panel (RAP) can now search and view applications from other councils within the RAP, in addition to the applications from their own council. |
DAP
Fixes | |
---|---|
Notification Email - Assigning Development Approval | When Development Approval is assigned to a user while a consent is in progress, the assigned user will now receive a notification email. |
DAP
Features | |
---|---|
Essential Safety Provisions (ESPs) - Editorial Changes | Small editorial changes have been made to the online ESPs - ‘NCC 2019 edition 9.08 (d)’, to accurately reflect the wording in the Ministerial Building Standard (MBS) 002. The update is reflected in existing building consents, both ‘under assessment’ and ‘granted’. |
Essential Safety Provisions (ESPs) - National Construction Code (NCC) 2022 | Effective 1 May 2023, online ESPs will reflect the NCC 2022 updates, for new applications and building consents ‘awaiting verification’ or ‘in verification’. The Building Consent – Assessment Date will be used to determine which ESP Schedule Options to use (NCC version 2019 or 2022) in the DAP:
|
Plan SA portal
Features | |
---|---|
Public Development Application Register | In the Public Development Application Register, information relating to the relevant assessment pathway and whether the Planning Consent requires public notification is now visible within the application overview tab, in addition to the verification snapshot document. |
PowerBI
Features | |
---|---|
Referral Body and Referral Body Receipts Reports | For the Referral Body & Referral Body Receipts reports, hyperlinks have been added to the Application IDs to open the applications in DAP. |
DAP
Features | |
---|---|
Sharing Access - Email with Code | The Sharing Access page now includes the ability for the access code to be sent by email. Users with access to the application can enter an email address, and the recipient will receive an email with the DA number and access code, as well as instructions. |
Referral Response - 'Reason' field | A new 'reason' field has been added to the referral response option "No comment to make". This allows the referral body to provide reasons as to why they do not want to provide comments on the application. |
Fixes | |
Referral Type 'Advice' - Response options | A new referral response option 'Do not support' has been added to the referral type 'Advice', in lieu of the 'Direct Refusal' option. This allows the referral body to inform the relevant authority that they do not support the application, and provide reason(s). |
Certificate of Occupancy - System Generated Email | When a decision is required for a Certificate of Occupancy (CoO), the system generated email will now be sent to both the organisation email address of the CoO issuer, and the allocated assessor of the Building Consent relevant authority (if available). However, if the CoO issuer is different to the relevant authority for Building Consent, the email will continue to only be sent to the organisation email address of the CoO issuer. |
RFI Reminder Email - Completed RFIs and Consents | System generated reminder emails for Requests for Further Information (RFIs) will no longer be sent to applicants, in the instance that a decision has already been made on the RFI or consent. |
Expired RFI - Issue decision | Relevant authority users will no longer be blocked from issuing a decision on a consent, in the instance that there is an expired Request for Further Information (RFI). |
RAP - Planning and Land Division Consents | Where a combined Planning and Land Division Consent is submitted in a Council that is a member of a Regional Assessment Panel (RAP), it will remain as one combined consent. It will no longer be automatically split into separate consents for Planning Consent and Land Division Consent. |
Batch Payments - Volume Applicant | Outstanding fee advices will now be visible in the Batch Payment page for volume applicants, for the scenario where an applicant is the ‘submitter’ but not the ‘owner’ of an application. |
Withdrawn / Cancelled Applications | When an application is withdrawn or cancelled, all the active tasks will be closed except for endorsement refund tasks. |
Relevant Authority Dashboards - Inspections | Once an inspection outcome has been recorded, the "Record Inspection Outcome” task will no longer remain on the “For your action” dashboard. |
PlanSA Portal
Features | |
---|---|
Approval Wizard - Private Bushfire Shelter | A new selection option is available within the Approval Wizard for 'Private Bushfire Shelter'. The Approval Wizard confirms that in all circumstances, approval will be required for this type of development. |
PlanSA Portal
Features | |
---|---|
Development Application Map Viewer for Currently Notified Developments | A new map viewer displays development applications that are currently being notified across the State, including Crown Developments and major projects. |
PowerBI
Features | |
---|---|
New - Building Inspections and Compliance Report | A new Building Inspections and Compliance Report has been created, to assist councils with the tracking and monitoring of inspections and building notifications, as well as compliance with Practice Directions 8 and 9. There are multiple pages within the report, including:
In the underlying data sections of the report, there are hyperlinks next to the Applications IDs, to open the applications in DAP. A ‘report definitions’ page provides definitions and calculation rules for the report. |
Council Areas Report | The following updates have been made to the Council Areas Report:
|
Workload Management Report | The following updates have been made to the Workload Management Report:
|
Fixes | |
Decommissioned Reports | The Inspections Council Report has now been decommissioned, and the information which was available in this report can now be accessed via the new Building Inspections and Compliance Report. |
DAP
Features | |
---|---|
Land Division Certificate Page – Child Location Details | Where applicable, child title details have been added to the location information section of the Land Division Certificate page in DAP. |
Building Notification - Completion of Building Work and Statement of Compliance | The following updates have been made to Building Notifications:
|
DAP Report - Building Notifications | A new “Notification Description” filter option has been added to the Building Notifications Report in DAP. Multiple notifications can be selected simultaneously within the filter. |
Fixes | |
Building Consent - Add a building or building work | The option to 'Add a building or building work' is now available from the Assessment Information page of a building consent (not staged). |
Applicant Dashboard - Deposited Land Division Certificates | When Land Division Certificates are deposited, the relevant application will now move from the “Land division Certificates” tab to the “Finalised” tab, on the applicant’s dashboard. |
Development Application Processing (DAP) - Task Mapping | An update has been made to the way in which relevant authority tasks are assigned within DAP, to ensure that:
|
Consent Status Update - Request for Information | When a referral body sends a request for information, the consent status will now appropriately update to 'Awaiting Further Information'. |
DAP Report – Export Building Notifications | When the Building Notifications Report is exported, the full address (including suburb and postcode) will now show for the Primary Contact and Builder nominated for the application. |
DALite
Features | |
---|---|
Internal Referrals | The Internal Referral capability is now available in DALite for searching, responding, and reassigning internal referrals to another respondee |
PlanSA Portal
Features | |
---|---|
Accredited Professionals Register – hide contact details | The phone number and email addresses for Accredited Professionals (APs) will now be hidden by default on the Accredited Professionals public register. The ability to 'opt in' is provided, in the instance that an AP would like their phone or email to be displayed on the public register. |
PowerBI
Fixes | |
---|---|
Power BI Landing Page Update | When accessing PowerBI via the “Council Application Management Reporting (PowerBI)” link on the Reports page in DAP, users will now be directed to the Workload Management report as the landing page. |
DAP
Features | |
---|---|
DAP Report - Building Notifications | Additional columns have been added to the Building Notifications report in DAP, to include the names and addresses of the Primary Contact and Builder nominated for the application. |
Certificate of Occupancy (CoO) - System Generated Email | When a Certificate of Occupancy (CoO) is applied for, the system generated email will now be sent to both the organisation email address of the CoO issuer, and the allocated assessor of the Building Consent relevant authority (if available). However, if the CoO issuer is different to the relevant authority for Building Consent, the email will continue to only be sent to the organisation email address of the CoO issuer. |
Fixes | |
Ad hoc Inspection - Respond to Rectification Notification | Applicants and relevant authority users can now submit a rectification response to an unsatisfactory ad hoc inspection. |
Verification – Fee Default for ‘Regulation 76 Advice’ | Where 'Land Division' and 'Boundary Realignment' elements have been selected, the 'Regulation 76 Advice' fee will now be included by default. |
Verification – Fee Default for Public Notification and Sign on Land | For consents requiring public notification, the associated fees will now be selected by default. This includes the ‘Public Notification’ fee and the ‘Sign On Land’ fee, in the instance that the relevant authority is nominated to erect the sign on land. |
Response to Request for Further Information (RFI) – Upload Documents | When an applicant responds to a request to provide further information (RFI), they can no longer confirm and submit their response if they have not uploaded any documents. |
Building Notification Response - System Generated Email | When a building notification is received, the system generated email will now contain the contact details of the authority responsible for undertaking the inspections, rather than automatically populating with the details of the relevant authority for Building Consent. |
Section 7 Data Extract - Conditions | Development applications submitted with transitional consents, which have no ongoing conditions for Building Consent, will now appear on the Section 7 data extract, along with any associated Building Indemnity Insurance details. |
Section 7 Data Extract – Building Indemnity Insurance | The associated Building Indemnity Insurance information within the Section 7 data extract now also includes a description of the Building Work that the insurance relates to. |
Decision Notification Form (DNF) - Statement of Compliance Additional Documentation | The Statement of Compliance section of the Decision Notification Form (DNF) now shows 'None specified' when no documents have been specified, for "The following certificates, reports or other documents must be provided to the building certifier or council (as relevant) with the completed Statement of Compliance under regulation 57(8)(c)." |
Decision Notification Form (DNF) Preview - Decision Date | When the decision date is updated by the relevant authority, the Decision Notification Form (DNF) preview will now update to reflect the date selected, rather than defaulting to today's date. |
Accredited Professional Portal
Fixes | |
---|---|
Resume Accreditation Renewal | Accredited professionals who are applying for the renewal of their accreditation, can now successfully resume their applications. |
DAP
Features | |
---|---|
Upload Documents - Withdrawn/Cancelled Applications | On the Application Summary screen, relevant authorities can now upload documents within the document tab after an application has been cancelled or withdrawn. |
Fixes | |
Sharing Access - Accredited Professionals | During submission, the checkbox "I am submitting this application on behalf of the applicant(s) listed below" has been disabled for Accredited Professional users, to ensure that they retain visibility of the application. Please note - Accredited Professionals can still nominate their clients as application contacts and share access codes with them, if required. |
Section 7 Data Extract | The following amendments have been made to the significant tree and land management sections of the data extract:
|
Essential Safety Provisions (ESP) - Character Limit | When creating an ESP, relevant authority users will be advised if they exceed the character limit in the free text field. |
Accredited Professional Portal
Features | |
---|---|
Accreditation Renewal – Statutory Declaration | The Accreditation Renewal application form has been updated to remove the requirement for the statutory declaration to be witnessed. |
Accreditation Renewal – Updated Links | Links within the Accreditation Renewal reminder email and application form have been updated, to assist applicants in completing these correctly. |
PowerBI
Fixes | |
---|---|
Workload Management Report | The ‘Timeframe’ icon in the navigation bar will now remain unselected, unless specifically selected by the user. |
DAP
Features | |
---|---|
Decision Notification Form – Advisory Notes | The Advisory Notes which are added to a refused consent, will now appear under the ‘General Advisory Notes’ section in the Decision Notification Form. |
Distribution of External Referrals | Following verification and the payment of fees, external referrals will now be automatically distributed (default setting). If a relevant authority does not want a referral distributed automatically, they can uncheck the box at referral verification. |
Development Approval – ‘Note’ Field for Minor Inconsistencies | When granting development approval, the relevant authority now has the ability add an internal note related to the consistency check. |
Saved Conditions, Notes and Reserved Matters | The following changes have been made to Saved Conditions, Notes, and Reserved Matters page, within Your Organisation:
Additional Changes to Conditions and Notes:
Additional Changes to Reserved Matters:
|
Fixes | |
Public Notification - Letter Template | In the Public Notification Letter template, some councils were identified as "Dc of [Council Name]". This has been updated to read "the District Council of [Council Name]". |
Reserved Matters - Event Audit Record | Where the Development Approval is put 'On Hold' by the system due to an unresolved reserved matter; the event history entry has been updated. The event history entry now correctly reflects that the hold was placed by the system, instead of showing that it was placed by the Relevant Authority user who last granted a Consent. |
Accredited Professional Portal
Features | |
---|---|
CAP/RAP Availability Status | Applicants applying for or renewing their Planning Level 2 accreditation will now be asked if they wish to have their availability for CAP/RAPs made publicly available on the online register, along with their email address. The online Accredited Professionals Register will then display if an accredited professional holding Planning Level 2 accreditation is available to be contacted for CAP/RAPs. |
AIBS Reinstatement as a Recognised Equivalent Scheme | The Australian Institute of Building Surveyors National Accreditation Scheme (AIBS) will once again be recognised as an equivalent scheme for the purposes of obtaining accreditation under the Accredited Professionals Scheme (APS). This applies to accreditation granted for building levels 1, 2 and 3 on and from 1 January 2023. |
PowerBI
Features | |
---|---|
Workload Management Report Updates | The following updates have been made to the Workload Management Report: Timeframes:
Workload Analysis Tiles:
Workload Analysis Public Notification Tile:
Workload Analysis Chart: Active Assessments Planning/Building Consents:
Definitions:
|
PowerBI Report Navigation Updates | For council finance users, a ‘Finance Reports’ section has been added to the main PowerBI navigation page. The following reports can now be accessed via this section: ‘Daily Till Report’, ‘Disbursement Report’, ‘RCTI’, ‘Receipts Report’, ‘Refund Report’. A ‘Help and Resources’ section has been added to the main navigation page. Currently available in this section, is information about the Council Area Report and the Workload Management Report. |
Fixes | |
Council Area Report -Navigation Bar Icon | The ‘Underlying Data’ Icon within the Council Area Report has been updated, to ensure that the icon is consistent across different reports. |
PowerBI Decommissioned Reports | The following pages within PowerBI Reports have been decommissioned: Council Report:
Indicator Council:
The information that was available in these reports can now be accessed in either the Workload Management Report or the Council Area Report. |
SAPPA
Fixes | |
---|---|
SAPPA - Development Application Details | When viewing Development Application details in SAPPA, the ‘Nature of Development’ field will reflect the most up-to-date Nature of Development description. |